Project Details

 
Lowell House Condominiums
Lowell House Condominiums

Lowell House Condominiums

29-story high-rise with brick and concrete cladding

PROBLEM

Building compression, environmental conditions and steel corrosion led to the following:

  • Water infiltration at the windows
  • Spalling brick masonry
  • Spalling on concrete at slabs and columns

SOLUTION

BAMR utilized scaffolding on the west elevation to complete the following repairs:

  • Removal and installation of new masonry at each floor/bay level on the west elevation
  • Repaired back-up CMU/concrete
  • Installed new stainless steel pan flashing at each floor/bay level
  • Installed new membrane flashing at each floor/bay level
  • Stained historical standard-size masonry blend to match existing

CLIENT

Lowell House Condominiums

PROJECT SIZE

29-story high-rise

MANAGEMENT COMPANY

Chicagoland Community Management

http://www.chicagoland-inc.com

ENGINEER / ARCHITECT

Wiss, Janney, Elstner Associates, Inc. http://www.wje.com/

ROLE

Masonry Restoration Contractor

LOCATION

88 W. Schiller, Chicago, IL

MARKET

Residential

Honors and Awards
ENR's Top 400
189
Number of Years in Business
126
Percent of Repeat Clients
70
Safety EMR Rating
0.57
LEED Accredited Professionals
25+
Contractor Score
2376
CM-BIM Certified Professionals
5
Subcontrators