Presidential Towers Concrete Restoration

PROBLEM

Water infiltration, deteriorated sealant, and steel corrosion led to the following:

  • Open/de-bonded sealant joints
  • Corrosion/expansion of the embedded steel components within the concrete
  • Spalling of the vertical concrete facade

SOLUTION

BAMR utilized suspended scaffolding to access every elevation of the circular façade to repair the following:

  • Sealant removal and replacement
  • Demolition of delaminated concrete, removal of embedded corrosion, replacement of embedded corroded steel, and installation of new concrete patch

CLIENT

The Habitat Company

PROJECT SIZE

49-story high rise

ENGINEER / ARCHITECT

George A. Kennedy & Associates http://www.gakltd.com

ROLE

Contractor

LOCATION

Chicago, IL

MARKET

Residential

Honors and Awards
ENR's Top 400
189
Number of Years in Business
126
Percent of Repeat Clients
70
Safety EMR Rating
0.57
LEED Accredited Professionals
25+
Contractor Score
2376
CM-BIM Certified Professionals
5
Subcontrators