Project Details

 
The Pierre
The Pierre
The Pierre

The Pierre

Facade repairs

PROBLEM

Building compression, environmental conditions, and steel corrosion led to the following:

  • Water infiltration at the windows
  • Spalling brick masonry
  • Sealant failure at windows and control joints

SOLUTION

BAMR erected scaffolding on various elevations to complete the following repairs:

  • Removed and installed new masonry, steel supports, and flashings at the window heads
  • Repaired back-up masonry and concrete
  • Replaced sealant around window perimeters and openings

CLIENT

Wolin-Levin/The Pierre Condominium Association

PROJECT SIZE

Not Applicable

MANAGEMENT COMPANY

Wolin-Levin

http://www.wolin-levin.com

ENGINEER / ARCHITECT

Wiss Janney Elstner Associates http://www.wje.com/

ROLE

General Contractor

LOCATION

Chicago, IL

MARKET

Residential

Honors and Awards
ENR's Top 400
189
Number of Years in Business
126
Percent of Repeat Clients
70
Safety EMR Rating
0.57
LEED Accredited Professionals
25+
Contractor Score
2376
CM-BIM Certified Professionals
5
Subcontrators