Water infiltration, deteriorated sealant, and steel corrosion led to the following:
- Delaminated coating on the vertical concrete
- Open/de-bonded sealant joints
- Corrosion/expansion of the embedded steel components within the concrete
- Spalling of the vertical concrete beams, columns, slabs, etc.
- Corrosion of the metal balcony railings
BAMR utilized suspended scaffolding to access every elevation of the circular façade to repair the following:
- Corrosion removal on the metal railings and new steel attachments
- Sealant replacement
- Installation of waterproofing membrane on the balconies of the top floors
- Demolition of delaminated concrete, removal of embedded corrosion, replacement of embedded corroded steel, and installation of new concrete patch