IIT Research Tower

Water infiltration, deteriorated sealant, and steel corrosion led to the following:

  • Open/de-bonded sealant joints
  • Corrosion/expansion of the embedded steel components within the concrete
  • Spalling of the vertical concrete facade

BAMR utilized suspended scaffolding to access every elevation of the circular façade to repair the following:

  • Sealant removal and replacement
  • Demolition of delaminated concrete, removal of embedded corrosion, replacement of embedded corroded steel, and installation of new concrete patch

Client

Illinois Institute of Technology

Project Size

20-story high rise

Architect / Engineer

Probe Consulting Services, Inc.

Role

Restoration Contractor

Location

Chicago, IL

Services

Concrete RepairsSealant Repairs

Market

Educational/Institutional