IIT Research Tower
Water infiltration, deteriorated sealant, and steel corrosion led to the following:
- Open/de-bonded sealant joints
- Corrosion/expansion of the embedded steel components within the concrete
- Spalling of the vertical concrete facade
BAMR utilized suspended scaffolding to access every elevation of the circular façade to repair the following:
- Sealant removal and replacement
- Demolition of delaminated concrete, removal of embedded corrosion, replacement of embedded corroded steel, and installation of new concrete patch