Presidential Towers

Water infiltration, deteriorated sealant, and steel corrosion led to the following:

  • Open/de-bonded sealant joints
  • Corrosion/expansion of the embedded steel components within the concrete
  • Spalling of the vertical concrete facade

BAMR utilized suspended scaffolding to access every elevation of the circular façade to repair the following:

  • Sealant removal and replacement
  • Demolition of delaminated concrete, removal of embedded corrosion, replacement of embedded corroded steel, and installation of new concrete patch

Client

The Habitat Company

Project Size

49-story high rise

Architect / Engineer

George A. Kennedy & Associates

Role

Restoration Contractor

Location

Chicago, IL

Service

Concrete Repairs

Market

Residential