The Farcroft Building

Building compression, environmental conditions, and steel corrosion led to the following:

  • Missing/Spalling Terra Cotta pieces
  • Spalling Brick Masonry
  • Deteriorated/Open Mortar Joints

BAMR erected scaffolding on all building elevations to complete the following repairs:

  • Salvage/Reinstall Terra Cotta
  • Replacement of Terra Cotta pieces
  • Install new steel shelf angles and anchorage

Client

Tawani Enterprises, Inc.

Project Size

13-story high rise

Architect / Engineer

Harboe Architects

Role

Restoration Contractor

Location

Chicago, IL

Services

Brick RestorationFaçade Structural RepairTerra Cotta RestorationTuckpointing Mortar Repairs

Market

Residential