The Pierre

Building compression, environmental conditions, and steel corrosion led to the following:

  • Water infiltration at the windows
  • Spalling brick masonry
  • Sealant failure at windows and control joints

BAMR erected scaffolding on various elevations to complete the following repairs:

  • Removed and installed new masonry, steel supports, and flashings at the window heads
  • Repaired back-up masonry and concrete
  • Replaced sealant around window perimeters and openings

Client

Wolin-Levin/The Pierre Condominium Association

Architect / Engineer

Wiss Janney Elstner Associates

Management Company

Wolin-Levin

Role

Restoration Contractor

Location

Chicago, IL

Service

Façade Structural Repair

Market

Residential