Building compression, environmental conditions, and steel corrosion led to the following:
- Water infiltration at the windows
- Spalling brick masonry
- Sealant failure at windows and control joints
BAMR erected scaffolding on various elevations to complete the following repairs:
- Removed and installed new masonry, steel supports, and flashings at the window heads
- Repaired back-up masonry and concrete
- Replaced sealant around window perimeters and openings